Custom Homebuilders (CH) designs and constructs high-end homes on large lots owned by customers. CH has developed several formulas, which it uses to quote jobs. These include costs for materials, labor, and other costs. These estimates are also dependent on the region of the country a particular customer lives. The following are the cost estimates for one region in the Midwest.

Administrative costs $ 20,000
Building costs – per square foot (basic) $ 90
Building costs – per square foot (moderate) $ 150
Building costs – per square foot (luxury) $ 225
Appliances (basic) $ 15,000
Appliances (moderate) $ 25,000
Appliances (luxury) $ 45,000
Utilities costs (if required) $ 40,000

Required:

A customer has expressed interest in having CH build a moderate, 3,000 square-foot home on a vacant lot, which does not have utilities. Based on the engineering estimates above, what will such a house cost to build?

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 16:10
Martinez manufacturing applies overhead based on direct labor hours. the company estimates that their overhead for the year will be $180,000, and that they will use 72,000 direct labor hours. during the year, martinez manufacturing actually used 75,000 direct labor hours and actual overhead costs were $190,000. at the end of the year, manufacturing overhead was: overapplied by $2,500. overapplied by $10,000. underapplied by $2,500. underapplied by $10,000.
Answers: 2
question
Business, 22.06.2019 01:00
Who is better at multi-tasking? in business, employees are often asked to perform a complex task when their atten-tion is divided (i.e., multi-tasking). human factors (may 2014) published a study designed to determine whether video game players are better than non–video game play-ers at multi-tasking. each in a sample of 60 college stu-dents was classified as a video game player or a non-player. participants entered a street crossing simulator and were asked to cross a busy street at an unsigned intersec-tion. the simulator was designed to have cars traveling at various high rates of speed in both directions. during the crossing, the students also performed a memory task as a distraction. two variables were measured for each student: (1) a street crossing performance score (measured out of 100 points) and (2) a memory task score (measured out of 20 points). the researchers found no differences in either the street crossing performance or memory task score of video game players and non-gamers. “these results,” say the researchers, “suggest that action video game players [and non-gamers] are equally susceptible to the costs of dividing attention in a complex task”
Answers: 1
question
Business, 22.06.2019 07:30
Select the correct answer. sarah works in a coffee house where she is responsible for keying in customer orders. a customer orders snacks and coffee, but later, cancels th snacks, saying she wants only coffee. at the end of the day, sarah finds that there is a mismatch in the snack items ordered. which term suggest data has been violated? a. security b. integrity c. adding d. reliability e. reporting
Answers: 3
question
Business, 22.06.2019 11:50
The smelting department of kiner company has the following production and cost data for november. production: beginning work in process 3,700 units that are 100% complete as to materials and 23% complete as to conversion costs; units transferred out 10,500 units; and ending work in process 8,100 units that are 100% complete as to materials and 41% complete as to conversion costs. compute the equivalent units of production for (a) materials and (b) conversion costs for the month of november. materials conversion costs total equivalent units
Answers: 1
You know the right answer?
Custom Homebuilders (CH) designs and constructs high-end homes on large lots owned by customers. CH...
Questions
question
Computers and Technology, 25.10.2019 07:43
question
Mathematics, 25.10.2019 07:43