subject
Business, 21.12.2019 01:31 GabbyLandry

Quick-screen is a clothing manufacturing company that specializes in producing commemorative shirts immediately following major sporting events such as the world series, super bowl, and final four. the company has been contracted to produce a standard set of shirts for the winning team, either state university or tech, following a college football bowl game on new year's day. the items produced include two sweatshirts, one with silk-screen printing on the front and one with print on both sides, and two t-shirts of the same configuration. the company has to complete all production within 72 hours after the game, at which time a trailer truck will pick up the shirts. the company will work around the clock. the truck has enough capacity to accommodate 1,200 standard-size boxes. a standard-size box holds 12 t-shirts, and a box of 12 sweatshirts is three times the size of a standard box. the company has budgeted $25,000 for the production run. it has 500 dozen blank sweatshirts and t-shirts each in stock, ready for production. the company wants to know how many dozen (boxes) of each type of shirt to produce in order to maximize profit

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:40
The economic advisor of a large tire store proposes the demand function d(p)equalsstartfraction 1900 over p minus 40 endfraction , where d(p) is the number of tires of one brand and size that can be sold in one day at price p. answer parts (a) through (e) below. a. recalling that the demand must be positive, what is the domain of this function? the domain consists of all possible values of â–¼ for which â–¼ p d(p) â–¼ does not exist. is positive. is zero. is negative. exists.
Answers: 3
question
Business, 22.06.2019 00:30
Needs to schedule the staffing of the center. it is open from 8am until midnight. larry has monitored the usage of the center at various times of the day and determined that the following number of computer consultants are required: time of dayminimum number of consultants required to be on duty8 am-noon4noon-4 pm84pm-8pm108pm-midnight6 two types of computer consultants can be hired: full-time and part-time. the full- time consultants work for eight consecutive hours in any of the shifts: morning (8am- 4pm), afternoon (noon-8pm) and evening (4pm-midnight). full-time consultants are paid $14 per hour. part-time consultants can be hired to work any of the four shifts listed in the table. part-time consultants are paid $12 per hour. an additional requirement is that during every time period, there must be at least two full-time consultants on duty for every part-time consultant on duty. larry would like to determine how many full-time and part-time consultants should work each shift to meet the above requirements at the minimum possible cost. formulate this as an lp problem. you must define your variables clearly
Answers: 2
question
Business, 22.06.2019 16:00
In microeconomics, the point at which supply and demand meet is called the blank price
Answers: 3
question
Business, 22.06.2019 19:00
Why is accountability important in managing safety
Answers: 2
You know the right answer?
Quick-screen is a clothing manufacturing company that specializes in producing commemorative shirts...
Questions
question
Mathematics, 05.03.2021 22:30