Tulip company produces two products, t and u. the indirect labor costs include the following two items: col1 plant supervision $700,000 col2 setup labor (indirect) 300,000 col3 total indirect labor $1,000,000 the following activity-base usage and unit production information is available for the two products: number of setups direct labor hours units col 1product t 200 20,000 900 col2 product u 200 30,000 1,100 col3 total 400 50,000 2,000 a. determine the single plantwide factory overhead rate, using direct labor hours as the activity base. $ per dlh b. determine the factory overhead cost per unit for products t and u, using the single plantwide factory overhead rate. round your answers to two decimal places. factory overhead cost per unit product t $ product u $ c. determine the activity rate for plant supervision and setup labor, assuming that the activity base for supervision is direct labor hours and the activity base for setup labor is number of setups. setup supervision activity rate $ per setup $ per dlh d. determine the factory overhead cost per unit for products t and u, using activity-based costing. round your answers to two decimal places. factory overhead cost per unit product t $ product u

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 05:00
What is a sort of auction for stocks in which traders verbally submit their offers?
Answers: 3
question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 11:00
Your debit card is stolen, and you report it to your bank within two business days. how much money can you lose at most? a. $500 b. $25 c. $50 d. $150
Answers: 2
question
Business, 22.06.2019 13:40
A.j. was a newly hired attorney for idle time gaming, inc. even though he reported directly to the president of the company, a.j. noticed that the president always had time to converse with the director of sales, calling on him to get a pulse on legal/regulatory issues that, as the company attorney, a.j. could have probably handled. a.j. also noted that the hr manager’s administrative assistant was the go-to person for a number of things that would make life easier at work. a.j. was recognizing the culture at idle time gaming.
Answers: 3
You know the right answer?
Tulip company produces two products, t and u. the indirect labor costs include the following two ite...
Questions