subject
Business, 08.10.2019 21:00 yselahernandez02

Lactose is milk sugar, and as infants, humans produce substantial amounts of the lactase enzyme to digest it. however, as we age, we soon lose some or even all of our lactase, in such cases, undigested lactose passes to the lower intestine where bacteria break down into lactic acid and co2, causing painful gas and bloating. this problem could be avoided by. a) avoiding all dairy products containing lactose. b) taking lactase enzyme tablets when consuming lactose productsc)taking any enzyme tablets when consuming dairy productsd) consuming lactose in tablet forme) taking lactase enzyme tablets or avoiding all dairy products.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 04:30
How does your household gain from specialization and comparative advantage? (what is produced, what is not produced yet paid to a specialist to produce? )
Answers: 3
question
Business, 22.06.2019 05:30
Laurelton heating & cooling installs and services commercial heating and cooling systems. laurelton uses job costing to calculate the cost of its jobs. overhead is allocated to each job based on the number of direct labor hours spent on that job. at the beginning of the current year, laurelton estimated that its overhead for the coming year would be $ 61 comma 500. it also anticipated using 4 comma 100 direct labor hours for the year. in april comma laurelton started and completed the following two jobs: (click the icon to view the jobs.) laurelton paid a $ 20-per-hour wage rate to the employees who worked on these two jobs. read the requirements requirement 1. what is laurelton's predetermined overhead rate based on direct labor hours? determine the formula to calculate laurelton's predetermined overhead rate based on direct labor hours, then calculate the rate. / = predetermined overhead rate
Answers: 2
question
Business, 22.06.2019 07:10
mark, a civil engineer, entered into a contract with david. as per the contract, mark agreed to design and build a house for david for a specified fee. mark provided david with an estimation of the total cost and the contract was mutually agreed upon. however, during construction, when mark increased the price due to a miscalculation on his part, david refused to pay the amount. this scenario is an example of a mistake.
Answers: 1
question
Business, 22.06.2019 17:00
Cadbury has a chocolate factory in dunedin, new zealand. for easter, it makes two kinds of “easter eggs”: milk chocolate and dark chocolate. it cycles between producing milk and dark chocolate eggs. the table below provides data on these two products. demand (lbs per hour) milk: 500 dark: 200 switchover time (minutes) milk: 60 dark: 30 production rate per hour milk: 800 dark: 800 for example, it takes 30 minutes to switch production from milk to dark chocolate. demand for milk chocolate is higher (500lbs per hour versus 200 lbs per hour), but the line produces them at the same rate (when operating): 800 lbs per hour. a : suppose cadbury produces 2,334lbs milk chocolate and 1,652 lbs of dark chocolate in each cycle. what would be the maximum inventory (lbs) of milk chocolate? b : how many lbs of milk and dark chocolate should be produced with each cycle so as to satisfy demand while minimizing inventory?
Answers: 2
You know the right answer?
Lactose is milk sugar, and as infants, humans produce substantial amounts of the lactase enzyme to d...
Questions
question
Mathematics, 12.10.2020 09:01
question
Mathematics, 12.10.2020 09:01
question
Mathematics, 12.10.2020 09:01
question
Mathematics, 12.10.2020 09:01