Biology, 30.03.2020 15:24 ahmadali89
Estimating time in hours/days:
a. is done at the Story Point level so that appropriate time for tasks can be allocated
b. is done at the task level in Scrum to validate the number of Story Points that are planned.
c. is never done in Scrum.
d. is the primary estimation tool used in scrum for schedule and budget tracking.
Answers: 1
Biology, 21.06.2019 17:00
When organisms are classified ,they are given a two part name
Answers: 1
Biology, 22.06.2019 11:00
What happens as electrons move along the chain of molecules known as the electron transport chain? they gain energy, which causes atp molecules to lose phosphate groups. they gain energy, which causes h *ions to join with oxygen to produce water. they lose energy, which is then used by the cell to make atp. they lose energy, which is then used to break down atp.
Answers: 3
Biology, 22.06.2019 11:30
Which of the following does not make up ground substance of connective tissue? hyaluronic acid elastic fibers glycosaminoglycan proteoglycan
Answers: 3
Estimating time in hours/days:
a. is done at the Story Point level so that appropriate time f...
a. is done at the Story Point level so that appropriate time f...
English, 19.11.2020 01:30
Mathematics, 19.11.2020 01:30
English, 19.11.2020 01:30
Mathematics, 19.11.2020 01:30
SAT, 19.11.2020 01:30
Mathematics, 19.11.2020 01:30
Social Studies, 19.11.2020 01:30
Mathematics, 19.11.2020 01:30
Mathematics, 19.11.2020 01:30
History, 19.11.2020 01:30