subject

Question 2 (Essay Worth 30 points) (04.05, 05.04, 07.04 HC)
At the start of the workday, 35,000 cubic feet of dirt was piled up at a construction site. Dirt will be added to the pile for the next 8 hours, satisfying the increasing
dP
differential equation
from the start of the workday.
(P-7,000), where the function Prepresents the total amount of dirt in the pile. Pis measured in cubic feet, and t is measured in hours
at
Part A: Estimate the amount of dirt in the pile after 3 hours, using the tangent line to the graph of Patt = 0. (10 points)
Part B: Find and used to determind or what you found in Part A was an underestimate or an overestimate at t = 3. (10 points)
dt2
dp
Part C: Find the general solution to the differential equation
(P-7.
(P-7,000). (10 points)

ansver
Answers: 1

Another question on Advanced Placement (AP)

question
Advanced Placement (AP), 25.06.2019 14:00
How much wood would a wood chuck wood if a wood chuck could chuck wood
Answers: 1
question
Advanced Placement (AP), 25.06.2019 17:30
Poland had achieved self government and can enjoy its since the collapse of the soviet union a: autonomy b: ingenuity c: feminismd: genocide
Answers: 1
question
Advanced Placement (AP), 26.06.2019 04:40
The double-blind procedure is most for a.random assignment b.the placebo effect c.operational definitions replication d. standard deviations
Answers: 2
question
Advanced Placement (AP), 26.06.2019 22:00
Which of the following properties of a soil sample most influences the flow of water through the sample a. colorb. fertilityc. permeability d. phe. salinity
Answers: 1
You know the right answer?
Question 2 (Essay Worth 30 points) (04.05, 05.04, 07.04 HC)
At the start of the workday, 35,0...
Questions
question
Mathematics, 02.11.2020 23:20
question
Computers and Technology, 02.11.2020 23:20
question
Mathematics, 02.11.2020 23:20
question
Chemistry, 02.11.2020 23:20